S.No. |
Name of Project |
Installed Capacity no. x kW |
Agency |
Year of Completion |
Status
|
|
1. |
Bafen Vihir in Maharashtra |
1 X 10 |
MNRE |
2007 |
Submitted |
|
2. |
Baram SHP (Modification) in Pithoragarh |
2 X 500 |
UREDA |
2007 |
Submitted |
|
3. |
Bhitri in Uttarakhand |
2 X 20 |
MNRE |
2007 |
Submitted |
|
4. |
Bod in M.P. |
1 X 10 |
MNRE |
2007 |
Submitted |
|
5. |
Changaria |
1X 50 + 1X 50 |
MNRE |
2007 |
Submitted |
|
6. |
Cheelud SHP |
2 X 50 |
UREDA |
2007 |
Submitted |
|
7. |
Dugtu |
1 X 20 |
MNRE |
2007 |
Submitted |
|
8. |
Gavar Gaon in Chhattisgarh |
2 X 20 |
MNRE |
2007 |
Submitted |
|
9. |
Goriya Deh in Jharkhand |
1 X 50 |
MNRE |
2007 |
Submitted |
|
10. |
Kedarnath |
1 X 20 |
MNRE |
2007 |
Submitted |
|
11. |
Khapugad MHP |
1 X 20 |
UREDA |
2007 |
Submitted |
|
12. |
Khatwa in Uttarakhand |
2 X 20 |
MNRE |
2007 |
Submitted |
|
13. |
Magra in Rajasthan |
2 X 20 |
MNRE |
2007 |
Submitted |
|
14. |
Nada MHP in Rikhnargad |
2 X 25 |
UREDA |
2007 |
Submitted |
|
15. |
Nagling |
2 X 20 |
MNRE |
2007 |
Submitted |
|
16. |
Neora SHP in West Bengal |
2 X 3000 |
Neora Hydro Ltd., Kolkata |
2007 |
Under Progress |
|
17. |
Obragad in Uttarakhand |
2 X 50 |
MNRE |
2007 |
Submitted |
|
18. |
Pareng SHP in Arunachal Pradesh |
2 X 3000 |
APEDA |
2007 |
Submitted |
|
19. |
Paro in A.P. |
2 X 80 |
MNRE |
2007 |
Submitted |
|
20. |
Patu in A.P. |
1 X 10 |
MNRE |
2007 |
Submitted |
|
21. |
PDD of Bundled SHP projects in Uttarakhand under CDM scheme |
CDM |
UREDA, Dehradun |
2007 |
Completed |
|
22. |
Pein SHP, Ph-I & II |
2 X 3000 |
APEDA |
2007 |
Under Progress |
|
23. |
Ram Krishanpur in West Bengal |
2 X 10 |
MNRE |
2007 |
Submitted |
|
24. |
Replacement of diesel operated vehicles by Battery operated vehicles in Dehradun |
CDM |
UREDA, Dehradun |
2007 |
Completed |
|
25. |
Sela |
2 X 20 |
MNRE |
2007 |
Submitted |
|
26. |
Shikarpur in West Bengal |
2 X 20 |
MNRE |
2007 |
Submitted |
|
27. |
Sie SHP in Arunachal Pradesh |
2 X 2800 |
APEDA |
2007 |
Submitted |
|
28. |
Singrauli SHP (Updating) |
2 X 4000 |
NTPC, ShaktiNagar |
2007 |
Submitted |
|
29. |
Uttarkashi & Borbalada |
1 X 20 |
UREDA |
2007 |
Submitted |
|
30. |
Valmiki Nagar SHP and Dehri SHP |
4 X 5000 |
BSHPC, Bihar |
2007 |
Under Progress |
|
31. |
Review of Tunga in Karnataka |
24 MW |
BMT Consultants Pvt. Ltd., Ahmedabad |
2006 |
Submitted |
|
32. |
Rongtong in HP |
2000 kW |
HPSEB |
2006 |
Under Progress |
|
33. |
Rukti SHP in HP |
1500 kW |
HPSEB |
2006 |
Under Progress |
|
34. |
Rajapur SHP |
|
BSHP, Patna |
2005-06 |
|
|
35. |
Ramgad-II in Uttaranchal |
2 X 50 |
UREDA |
2005-06 |
Submitted |
|
36. |
Suringad SHP |
300 kW |
UJVNL, Dehradun |
2005-06 |
Under Progress |
|
37. |
Uhl SHP in HP |
|
Puri Oil Mills Ltd., New Delhi |
2005-06 |
|
|
38. |
Updation – Mukto SHP in Ar.P. |
3 X 1500 |
DHPD, Itanagar |
2005-06 |
|
|
39. |
Niti SHP |
2 X 25 |
Samiti and UREDA |
2004-05 |
Under Progress |
|
40. |
|
2 X 500 |
J&KPDC |
2004 |
Under Progress |
|
41. |
2 SHP in Uttaranchal |
|
UREDA |
2004 |
Completed |
|
42. |
Palor-II, H.P. |
2 X 1500 |
Manglam SHP, Noida |
2004 |
Completed |
|
43. |
Tarkiana on Canal Fall |
2 X 100 |
PEDA, Punjab |
2004 |
Completed |
|
44. |
Kunnu Charang |
2 X 100
|
HimUrja, Shimla |
2003-04 |
Under Progress |
|
45. |
Akbarpur SHP |
2 X 250
|
NEDA, Lucknow |
2003 |
Under Progress |
|
46. |
Badarpur TPS-Tail Water SHP |
1 X 400
|
NPTI, Faridabad |
2003 |
Submitted |
|
47. |
Betwa canal Head SHP |
3 X 650
|
NEDA, Lucknow |
2003 |
Under Progress |
|
48. |
Betwa SHP |
2 X 1000
|
NEDA, Lucknow |
2003 |
Under Progress |
|
49. |
Chudiyala SHP |
2 X 250
|
NEDA, Lucknow |
2003 |
Under Progress |
|
50. |
Dabka river – Dabka |
1 X 80
|
UREDA, Uttaranchal |
2003 |
Completed |
|
51. |
Dasna SHP |
2 X 1000
|
NEDA, Lucknow |
2003 |
Under Progress |
|
52. |
Gunchai SHP |
2 X 400
|
NEDA, Lucknow |
2003 |
Under Progress |
|
53. |
Jamini Dam-I |
1 X 100
|
NEDA, Lucknow |
2003 |
Under Progress |
|
54. |
Jamini Dam-II |
1 X 100
|
NEDA, Lucknow |
2003 |
Under Progress |
|
55. |
Kuthond-I SHP |
2 X 350 |
NEDA, Lucknow |
2003 |
Under Progress |
|
56. |
Kuthond-II SHP |
2 X 350 |
NEDA, Lucknow |
2003 |
Under Progress |
|
57. |
Manglay |
2 X 1000
|
Deptt. Of Power, Sikkim |
2003 |
Completed |
|
58. |
Sikasar Dam |
2 X 3500
|
Chhattisgarh State Electricity Board |
2003 |
Completed |
|
59. |
Updating/Revision of DPR - Bhalla SHP |
2 X 750
|
J&KPDC, Jammu |
2003 |
Under progress |
|
60. |
Updating/Revision of DPR - Brenwar SHP |
2 X 1000 |
J&KPDC, Jammu |
2003 |
Under progress |
|
61. |
Updating/Revision of DPR - Chingus SHP |
2 X 300 |
J&KPDC, Jammu |
2003 |
Under progress |
|
62. |
Updating/Revision of DPR - Mohumangath MHS |
2 X 300 |
J&KPDC, Jammu |
2003 |
Under progress |
|
63. |
Updating/Revision of DPR – Poonch SHP |
2 X 250 |
J&KPDC, Jammu |
2003 |
Under progress |
|
64. |
Updating/Revision of DPR – Tulei SHP |
2 X 350 |
J&KPDC, Jammu |
2003 |
Under progress |
|
65. |
Upgradation/Revision - Bogdong |
2 X 350 |
J&K SPDC Ltd. |
2003 |
Completed |
|
66. |
Upgradation/Revision - Dah |
2 X 1500 |
J&K SPDC Ltd. |
2003 |
Completed |
|
67. |
Upgradation/Revision - Dumkhar |
1 X 200 |
J&K SPDC Ltd. |
2003 |
Completed |
|
68. |
Upgradation/Revision - Hanu |
2 X 1500 |
J&K SPDC Ltd. |
2003 |
Completed |
|
69. |
Upgradation/Revision - Kumdok |
3 X 75 |
J&K SPDC Ltd. |
2003 |
Completed |
|
70. |
Upgradation/Revision - Sasoma |
2 X 250 |
J&K SPDC Ltd. |
2003 |
Completed |
|
71. |
Upgradation/Revision - Tangste |
2 X 250 |
J&K SPDC Ltd. |
2003 |
Completed |
|
72. |
Chaksi |
2 X 500 |
Puri Oil Mills |
2002 |
Completed |
|
73. |
Dhukwa Dam |
2 X 15000 |
UP Jal Vidyut Nigam |
2002 |
Submitted |
|
74. |
Gandak – Saran Canal RD II |
1000 kW |
BHPC, Patna |
2002 |
Submitted |
|
75. |
Gandak Saran RD-II |
1000 kW |
BHPC, Patna |
2002 |
Completed |
|
76. |
Ghes |
100 kW |
UREDA |
2002 |
Under Progress |
|
77. |
Lamchula |
50 kW |
UREDA |
2002 |
Under Progress |
|
78. |
Main Canal – Golapar |
1 X 150 |
UREDA, Uttaranchal |
2002 |
Completed |
|
79. |
Mukerian Stage-II |
2 X 9000 |
PSEB |
2002 |
Submitted |
|
80. |
Nandhor Main river – Chorgalia |
1 X 100 |
UREDA, Uttaranchal |
2002 |
Completed |
|
81. |
Rotan |
50 kW |
UREDA |
2002 |
Under Progress |
|
82. |
Tarula |
100 kW |
UREDA |
2002 |
Under Progress |
|
83. |
Uhl |
2 X 1000 |
Puri Oil Mills |
2002 |
Completed |
|
84. |
Amritganga HE |
500 kW |
NEDA, Lucknow |
2001 |
Under Progress |
|
85. |
Baran HE |
1000 kW |
NEDA, Lucknow |
2001 |
Under Progress |
|
86. |
Jimigad HE |
900 kW |
NEDA, Lucknow |
2001 |
Under Progress |
|
87. |
Lachen |
2000 kW |
DOP, Sikkim |
2001 |
Submitted |
|
88. |
Manjusha |
2 X 250 |
BHPC |
2001 |
Completed |
|
89. |
Miyagam BC SHP CH 16700 m |
3 X 750 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
90. |
Miyagam BC SHP CH 6415 m |
2 X 750 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
91. |
Miyagam BC SHP CH 9900 m |
3 X 750 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
92. |
Miyagam BC SHP CH 4150 m |
2 X 750 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
93. |
Miyagam BC SHP CH 7500 m |
2 X 750 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
94. |
Miyagam BC SHP CH 8531 m |
2 X 500 |
SSNNL, Gandhinagar |
2001 |
Submitted |
|
95. |
Rellichu |
6000 kW |
DOP, Sikkim |
2001 |
Submitted |
|
96. |
Ringyang |
1000 kW |
DOP, Sikkim |
2001 |
Submitted |
|
97. |
Rongli-I |
5000 kW |
DOP, Sikkim |
2001 |
Submitted |
|
98. |
Telhargad |
2 X 1000 |
BHPC |
2001 |
Completed |
|
99. |
Dhokti Gaon |
1 X 20 |
UREDA, Uttaranchal |
2000 |
Completed |
|
100. |
Kanol Gad |
2 X 50 |
UREDA, Uttaranchal |
2000 |
Completed |
|
101. |
Karmi-II |
2 X 25 |
UREDA, Uttaranchal |
2000 |
Completed |
|
102. |
Ratmoli |
2 X 25 |
UREDA, Uttaranchal |
2000 |
Completed |
|
103. |
Rawat Sera |
1 X 50 |
UREDA, Uttaranchal |
2000 |
Completed |
|
104. |
San Gad |
1 X 50 |
UREDA, Uttaranchal |
2000 |
Completed |
|
105. |
Satteshwar |
2 X 25 |
UREDA, Uttaranchal |
2000 |
Completed |
|
106. |
Saurastra BC-Ch 5.15 km |
2 X 8000 |
SSNNL, Gandhinagar |
2000 |
Submitted |
|
107. |
Saurastra BC-Ch 17.76 km |
2 X 8000 |
SSNNL, Gandhinagar |
2000 |
Submitted |
|
108. |
Saurastra BC-Ch 32.94 km |
2 X 8000 |
SSNNL, Gandhinagar |
2000 |
Submitted |
|
109. |
Valipur fall |
2 X 200 |
NEDA, Lucknow |
2000 |
Submitted |
|
110. |
Tarrit Tara mini hydel |
2 X 1500 |
Deptt. Of Power, Govt. of Ar. P. |
1998-99 |
DPR Completed |
|
111. |
Ampani mini hydel |
|
Deptt. Of Power, Govt. of Ar. P. |
1998 |
DPR Completed |
|
112. |
Baraf mini hydel |
|
Deptt. Of Power, Govt. of Ar. P. |
1998 |
Dropped |
|
113. |
Dao mini hydel |
|
Deptt. Of Power, Govt. of Ar. P. |
1998 |
Under Preparation |
|
114. |
Ganga mini hydel |
2 X 250 |
Deptt. Of Power, Govt. of Ar. P. |
1998 |
DPR Completed |
|
115. |
Halaipani mini hydel |
3 X 3000 |
Deptt. Of Power, Govt. of Ar. P. |
1998 |
DPR Completed |
|
116. |
Kakra Gad/Akash Kamini |
2 X 20 |
UNDP-GEF |
1998 |
Under Construction |
|
117. |
Review of SHP Scheme at Tons I |
2 X 1500 |
Subhash Projects & Marketing Ltd. |
1998 |
Under Construction |
|
118. |
Review of SHP Scheme at Tons II |
2 X 1500 |
Subhash Projects & Marketing Ltd. |
1998 |
Under Construction |
|
119. |
Review of SHP Scheme at Tons III |
3 X 5000 |
Subhash Projects & Marketing Ltd. |
1998 |
Under Construction |
|
120. |
Urinfall mini hydel |
|
Deptt. Of Power, Govt. of Ar. P. |
1998 |
Under Preparation |
|
121. |
Wakka mini hydel |
|
Deptt. Of Power, Govt. of Ar. P. |
1998 |
Dropped |
|
122. |
Hnahchanglui Mini Hydel Project |
2 X 400 |
Power & Electricity Deptt., Govt. of Mizoram |
1997-98 |
Completed |
|
123. |
Chillong in Kargil |
250 kW |
Power & Electricity Deptt., Govt. of Mizoram |
1997 |
DPR Completed |
|
124. |
Dah Hydel Scheme Leh-Khalsi |
3000 kW |
Deptt. Of Power, Govt. of Ar. P., Power & Dev. Deptt., J&K Govt. |
1997 |
DPR Completed |
|
125. |
Kanvaashram |
2 X 50 |
UNDP-GEF |
1997 |
Under Construction |
|
126. |
Kumdong Leh |
100 kW |
Power Dev. Corporation |
1997 |
Submitted |
|
127. |
Lingti SHP |
2 X 200 |
HIM Urja, HP Govt |
1997 |
Under Construction |
|
128. |
Miyagam Branch Canal RD 2315 m |
3 X 750 |
Sardar Sarovar Narmada Nigam Ltd. |
1997 |
Submitted |
|
129. |
Rambhadra Mini Hydel Project |
2 X 1000 |
Deptt. Of Power, Agartalla |
1997 |
Submitted |
|
130. |
Review of SHP Scheme at Birhiganga |
2 X 1250 |
Subhash Projects & Marketing Ltd. |
1997 |
Under Construction |
|
131. |
Review of SHP Scheme at Rishiganga |
2 X 3500 |
Power Dev. Corporation |
1997 |
Under Construction |
|
132. |
Sekku mini hydel |
3 X 250 |
Deptt. Of Power, Govt. of Ar.P. |
1997 |
DPR Completed |
|
133. |
Stakna State II |
2.5 MW |
Power Dev. Corporation |
1997 |
Under Preparation |
|
134. |
Upshi-Igo Hydel Scheme |
3000 kW |
Deptt. Of Power, Govt. of Ar.P., Power & Dev. Deptt., J&K Govt. |
1997 |
Under Construction |
|
135. |
Bogdong in Norba |
200 kW |
Power Dev. Corporation |
1996 |
Submitted |
|
136. |
Farakka SHP |
2 X 250 |
NTPC/FSTPS |
1996 |
Submitted |
|
137. |
Gangotri micro hydel |
2 X 100 |
NEDA, Lucknow |
1996 |
Under Construction |
|
138. |
Hanu Hydel Scheme Leh-Khalsi |
3000 kW |
Deptt. Of Power, Govt. of Ar.P., Power & Dev. Deptt., J&K Govt. |
1996 |
DPR Completed |
|
139. |
Hanuman Ganga Small Hydro Uttarkashi |
2 X 1500 |
Regency Motels Paonta Sahib (HP) |
1996 |
Under Construction |
|
140. |
Jaidary Canal |
2 X 100 |
Haryana State EB Yamuna Nagar |
1996 |
DPR Submitted |
|
141. |
Jugding mini hydel |
3 X 1000 |
Deptt. Of Power, Govt. of Ar.P. |
1996 |
Under Construction |
|
142. |
Rina Mini Hydel, Along |
4 X 500 |
Deptt of Power, Arunachal Pradesh |
1996 |
Submitted |
|
143. |
Sasoma Hydel Scheme in Nobra valley |
3 X 300 |
Deptt. Of Power, Govt. of Ar.P., Power & Dev. Deptt., J&K Govt. |
1996 |
DPR Completed |
|
144. |
Siemen mini hydel |
3000 kW |
Deptt. Of Power, Govt. of Ar.P., Power & Dev. Deptt., J&K Govt. |
1996 |
DPR Completed |
|
145. |
Subbong mini hydel |
3 X 1000 |
Deptt. Of Power, Govt. of Ar.P. |
1996 |
Submitted |
|
146. |
Thusgam stage-I |
2 X 100 |
Power Dev. Corporation |
1996 |
DPR Completed |
|
147. |
Augmentation Canal |
2 X 500 |
Haryana State EB Yamuna Nagar |
1995 |
Submitted |
|
148. |
Jamar Kotra micro hydel |
1 X 50 |
REDA, Jaipur |
1995 |
Submitted |
|
149. |
Jhamri dam micro |
1 X 50 |
REDA, Jaipur |
1995 |
Submitted |
|
150. |
Rajouri small hydro |
3 X 1000 |
Power Dev Corp, J&K Govt. |
1995 |
Submitted |
|
151. |
Tukvar Tea Estate Small Hydro |
2 X 200 |
Jayshree Tea Darjeeling |
1995 |
Submitted |
|
152. |
Korba Small Hydro Project |
2 X 750 |
NTPC, Korba |
1994 |
Submitted |
|
153. |
Lower Ghagri Mini Hydel |
2 X 200 |
Bihar State Hydro Electric Power Corporation, Patna |
1994 |
Under Construction |
|
154. |
Sadani Mini Hydel |
2 X 500 |
Bihar State Hydro Electric Power Corporation, Patna |
1994 |
Under Construction |
|
155. |
Sippi Mini Hydel |
3 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1994 |
Under Construction |
|
156. |
Deverebelkere Mini Hydel |
2 X 1000 |
Karnataka Power Corporation Ltd., Bangalore |
1993 |
Commissionned |
|
157. |
Domkhorong Mini Hydel |
2 X 1000 |
Deptt.of Power, Govt. of A.P. Naharlagun |
1993 |
Ready for Commissioning |
|
158. |
Feroz Gandhi Unchahar Thermal Power Project mini hydro power |
1 X 250 |
NTPC, Unchahar |
1993 |
Submitted to Govt. |
|
159. |
Kambang Mini Hydel |
2 X 1500 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
160. |
Khangtang small hydel |
3 X 2500 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
161. |
Kitpi II mini hydel |
3 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
162. |
Kush mini hydel |
2 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
163. |
Liromoba Mini Hydel |
2 X 1000 |
Deptt.of Power, Govt. of Ar. P. Naharlagun |
1993 |
Under Construction |
|
164. |
Mukto small hydel |
3 X 3000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
165. |
NTU Micro Hydel |
1 X 100 |
Deptt. Of Forest, Govt. of Nagaland |
1993 |
Submitted to Govt |
|
166. |
Nuranang small hydel |
3 X 2000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Commissioned |
|
167. |
Pacha mini hydel |
2 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
168. |
Passighat-II mini hydel |
2 X 250 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Submitted to Govt. |
|
169. |
Payu mini hydel |
2 X 500 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Submitted to Govt. |
|
170. |
Siddip mini hydel |
3 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
171. |
Sigrauli Super TPS return canal fall SHP |
2 X 1500 |
Sigrauli Super Thermal Power Station NTPS, Sonebhadra (UP) |
1993 |
Under Construction |
|
172. |
Sipit mini hydel |
2 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Under Construction |
|
173. |
Sirnyuk mini hydel |
3 X 1000 |
Deptt.of Power, Govt. of Ar.P. Naharlagun |
1993 |
Commissioned |
|
174. |
Sarkari Mini Hydel |
2 X 750 |
U.P. Laghu Jal Vidyut Nigam Ltd. |
1991 |
State PIB cleared |
|
175. |
Netarhat Micro hydel |
1 X 50 |
Bihar State EB/BSHPC |
1990 |
Under Construction |
|
176. |
Bilkot Micro hydel |
1 X 50 |
Non-Conventional Energy Development Agency, Govt. of U.P. |
1989 |
Commissioned |
|
177. |
Pantwari Micro hydel |
1 X 50 |
Non-Conventional Energy Development Agency, Govt. of U.P. |
1989 |
Dropped by State Govt. |
|
178. |
Bahadrabad Mini Hydel |
2 X 125 |
DNES & UPLJV |
1987 |
Govt. sanction received |
|
179. |
Baram Micro hydel |
2 X 25 |
Non-Conventional Energy Development Agency, Govt. of U.P. |
1987 |
Under consideration by State Govt. |
|
180. |
Barboria mini hydel |
2 X 150 |
DNES & OPGC |
1987 |
Under Execution |
|
181. |
Bargarh Mini Hydel |
1 X 250 |
DNES & OPGC |
1987 |
Under Construction |
|
182. |
Kendupatna Mini Hydel |
2 X 125 |
DNES & OPGC |
1987 |
Commissioned |
|
183. |
Khet Micro Hydel |
2 X 50 |
Non-Conventional Energy Development Agency, Govt. of U.P. |
1987 |
Commissioned |
|
184. |
Killara (Pangi Valley) |
3 X 100 |
DNES & HPSEB |
1986 |
Commissioned |
|
185. |
Ralla Mini Hydel |
1 X 250 |
DNES & PSEB |
1986 |
Govt. sanction received |
|
186. |
Igo-Mercllong |
3 MW |
Power Dev.
Corporation |
|
Under Preparation |
|
187. |
Phyang in Leh |
340 kW |
Power Dev.
Corporation |
|
Under Preparation |
|
188. |
Tangste-Nyoma Leh
|
300 kW |
Power Dev. Corporation |
|
Submitted
|